local case study

Sweden

Klagerup

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Klågerup Kraft AB. The wind farm is located about 2 kilometers north of Klågerup, southern Sweden. The wind farm consists of wind turbines of the model Senvion MM92 MW and is rated at a total of 6.15 MW. The plant is expected to produce 18,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 3,600 residential houses.

6.15 MW of installed capacity
17 GWh of annual output
3 wind turbines

local case study

Sverige

Klagerup

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Klågerup Kraft AB. The wind farm is located about 2 kilometers north of Klågerup, southern Sweden. The wind farm consists of wind turbines of the model Senvion MM92 MW and is rated at a total of 6.15 MW. The plant is expected to produce 18,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 3,600 residential houses.

6.15 MW of installed capacity
17 GWh of annual output
3 wind turbines

Project Location

Technical Information

LocationKlågerup, Svedala
Number of turbines3
Output6.15 MW
Annual production17 GWh
TechnologyREpower MM92
Hub height80 m
Rotor diameter92 m
Total height126 m
Commissioned2011
ManagerChristian Eriksson