local case study

Sweden

Tollarpabjär

BayWa r.e. served as the customer's advisor during the procurement process and has since 1 January 2018 responsibility for the technical management of the wind farm for the owner Vindpark Em AB.

2.35 MW of installed capacity
7 GWh of annual output
92 m Rotor diameter

local case study

Sverige

Tollarpabjär

BayWa r.e. served as the customer's advisor during the procurement process and has since 1 January 2018 responsibility for the technical management of the wind farm for the owner Vindpark Em AB.

2.35 MW of installed capacity
7 GWh of annual output
92 m Rotor diameter

Project Location

Technical Information

LocationArkelstorp, Kristianstad
Number of turbines1
Output2.35 MW
Annual production7 GWh
TechnologyEnercon E92
Hub height98 m
Rotor diameter92 m
Total Height144 m
Commissioned2014
ManagerJonas Mårtensson