local case study
SwedenThe wind farm consists of six Nordex N131 wind turbines, each producing an impressive 3.9 MW for a total of 23.4 MW. The plant produces 71,000 MWh per year, which is equivalent to the electricity needs of 14,200 typical households.
BayWa r.e. handled everything from the design and financing to the construction and sale of the wind farm. The facility is located in the municipality of Vetlanda, about 20 kilometers northeast of Växjö.
Location | Slageryd, Municipality of Vetlanda |
---|---|
Number of turbines | 6 |
Output | 23.4 MW |
Annual production | 71 GWh |
Technology | Nordex N131 3.9 MW |
Hub Height | 114 m |
Rotor Diameter | 131 m |
Total Height | 179.5 m |
Commissioned | 2020 |
Manager | Christian Erkisson |