Choose language
Scandinavia
Choose different website
Current website:
Scandinavia
Website / Country
Languages
Social Media
Website / Country
Languages
Social Media

local case study

Sweden

Slageryd

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Slageryd. The wind farm is located about 2 kilometers north west of Slageryd. 

The wind farm consists of six wind turbines of the model Nordex N131 3.9 MW and is rated at a total of 23.4 MW. The plant is expected to produce 71,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 14,200 residential houses.

23.4 MW of installed capacity
71 GWh of annual output
6 wind turbines

local case study

Sverige

Slageryd

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Slageryd. The wind farm is located about 2 kilometers north west of Slageryd. 

The wind farm consists of six wind turbines of the model Nordex N131 3.9 MW and is rated at a total of 23.4 MW. The plant is expected to produce 71,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 14,200 residential houses.

23.4 MW of installed capacity
71 GWh of annual output
6 wind turbines

Project Location

Technical Information

LocationSlageryd, Municipality of Vetlanda
Number of turbines6
Output23.4 MW
Annual production71 GWh
TechnologyNordex N131 3.9 MW
Hub Height114 m
Rotor Diameter131 m
Total Height179.5 m
Commissioned2020
ManagerChristian Erkisson
Back to top
Get in touch