Choose language
Scandinavia
Choose different website
Current website:
Scandinavia
Website / Country
Languages
Social Media
Website / Country
Languages
Social Media

local case study

Sweden

Malajord

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Målajord. The wind farm is located about 20 kilometers north east of Växjö. 

The wind farm consists of three wind turbines of the model Nordex N149 4.8 MW and is rated at a total of 14.4 MW. The plant is expected to produce 50,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 10,000 residential houses. 

14.4 MW of installed capacity
50 GWh of annual output
3 wind turbines

local case study

Sverige

Malajord

BayWa r.e. has been responsible for the design, development, procurement, management, finance, construction project management and sale of Målajord. The wind farm is located about 20 kilometers north east of Växjö. 

The wind farm consists of three wind turbines of the model Nordex N149 4.8 MW and is rated at a total of 14.4 MW. The plant is expected to produce 50,000 MWh per year, which is equivalent to the annual electricity consumption (heating excluded) of 10,000 residential houses. 

14.4 MW of installed capacity
50 GWh of annual output
3 wind turbines

Project Location

Technical Information

LocationMålajord, Växjö
Number of turbines3
Output14.4 MW
Annual Production50 GWh
TechnologyNordex N149 - 4.8 MW
Hub Height135 m
Rotor Diameter149 m
Total Height210 m
Commissioned2021
ManagerChristian Eriksson
Back to top
Get in touch