local case study
SwedenThe wind farm provides 50,000 MWh annually, which is enough green electricity to supply about 10,000 typical households.
BayWa r.e. handled everything from design and financing to the construction and sale of the wind farm.
The park consists of three Nordex N149 wind turbines, each with a capacity of 4.8 MW. In total, the wind farm generates 14.4 MW.
Location | Målajord, Växjö |
---|---|
Number of turbines | 3 |
Output | 14.4 MW |
Annual Production | 50 GWh |
Technology | Nordex N149 - 4.8 MW |
Hub Height | 135 m |
Rotor Diameter | 149 m |
Total Height | 210 m |
Commissioned | 2021 |
Manager | Christian Eriksson |