local case study
SwedenBayWa r.e. was responsible for the design, engineering, procurement, administration, financing, construction project management, and sale of the facility. It is located north of Klågerup and consists of three Senvion MM92 wind turbines, each of which has a rated capacity of 2.05 MW, providing a total output of 6.15 MW. The plant produces around 18,000 MWh per year, which is equivalent to the annual consumption of 3,600 typical households.
Location | Klågerup, Svedala |
---|---|
Number of turbines | 3 |
Output | 6.15 MW |
Annual production | 17 GWh |
Technology | REpower MM92 |
Hub height | 80 m |
Rotor diameter | 92 m |
Total height | 126 m |
Commissioned | 2011 |
Manager | Christian Eriksson |